Toggle navigation Back

Potter IntelliView™ Troubleshooting


Purge Valve


Low N2 measured after initial Perfect Purge purge cycle completed

Issue: The INS-PV measured nitrogen level below 98%.

Action:

  1. Check to ensure that ball valve between INS-PV and sprinkler system is open.
  2. Ensure the Nitrogen Generator is in Nitrogen Generating Mode. This can be checked by using a portable nitrogen analyzer. The N2 level % leaving the membrane should be 98% or greater. Note the nitrogen generator needs to be running for accurate nitrogen reading. Call technical support if nitrogen leaving membrane is not 98% or greater.